Half-ass it with everything you've got
Notes. — 2026-03-05. — 1 tracing. — Provisional record.
Minimum viable effort, applied at maximum intensity. Not the same as doing less.
The phrase is not mine and it is regularly misread as permission to coast. It is the opposite. It says: decide the smallest version that would actually count, and then put everything into that version rather than into a larger one you will not finish.
The hard part is the deciding, not the doing. Every project has a defensible larger version, and the larger version is always more interesting to think about than the small one is to build. Scope inflation does not arrive as a decision. It arrives as a series of reasonable additions, each of which is genuinely a good idea.
So the rule I try to hold: the scope is fixed at the start and written down where I can see it, and anything I want to add goes on a separate list that I am not allowed to look at until the small version exists. Most of the list turns out to be wrong once the thing is real, which is the point.
Tracings
Drawn from this record.
Traced from
Records that point here.
- P103Casablanca in OctoberPoetry
- F102Forecasting my own projectsForecasting
- N101The legitimacy loopNotes